Engineering studies was part of the turnkey EPC contract (Engineering - Procurement - Construction). The principal project data where:
1- Purpose: Production of 200 000 m3/day of drinking water.
2- Process: Reverse Osmosis technology with Energy Recovery Exchangers.

Read 2657 times

Contact

33 Rue Larbi Mansouri, Kouba - 16050
Alger, Algérie
Tél. : 213 (0) 23 77 81 07 / 213 (0) 23 77 81 09 / 213 (0) 23 77 81 16
Fax : 213 (0) 23 77 80 02